To prepare a massive site for installation of solar panels, crews from Brad Cole Construction Co. in Carrollton, GA, are moving more than five million cubic yards of earth at the Taylor 3 Solar Site. To grasp the scope of the project, think of 826 football fields laid out side-by-side and end-to-end. http://bit.ly/2fJOq9a
[VIDEO] Caterpillar Grade with 3D Technology Helps Move 5 Million Cubic Yards of Earth
To prepare a massive site for installation of solar panels, crews from Brad Cole Construction Co. in Carrollton, GA, are moving more than five million cubic yards of earth at the Taylor 3 Solar Site.
Nov 29, 2016
Latest in Dirt Work
5 Preconstruction Tips To Improve Mat Quality
April 28, 2026
Volvo CE Adds New SD70 Soil Compactor to Lineup
March 11, 2026







![[VIDEO] Vortex Backhoe Loader Training Module](https://p1-cms-assets.imgix.net/files/base/acbm/fcp/image/2016/11/default.583326ba65ccc.png?auto=format%2Ccompress&fit=crop&h=167&q=70&w=250)











